1st Stage
- GTI Fujairah
- Apr 12
- 1 min read
Updated: Apr 20
I Workflow Stage (2009).

Unit: Crude Unit - 1.Initial nameplate capacity: 0.4 MTPA.After re-equipment in 2010 nameplate capacity amounted to 0.74 MTPA.Processing depth: 55%.Storage tanks: 52,000 cu.m.2 either-direction railway tank filling racks.2 road tanker filling racks.Capacity of crude oil transportation through oil trunk pipelines of Transneft JSC – 0.5 MTPA.Connected to the Shaim – Tyumen oil trunk pipeline with the capacity of up to 0.6 MT.
























Commenti