2nd Stage
- GTI Fujairah
- Apr 12
- 1 min read
Updated: Apr 16
II Workflow Stage (2012)

Units: Crude Unit - 2 with gasoline stabilizer.
Initial nameplate capacity: 2.5 MTPA.
After re-equipment in 2012 nameplate capacity amounted to 3.3 MTPA.
Total capacity of the refinery (Crude Unit - 1 + Crude Unit - 2) made up to 4.0 MTPA.
Processing depth: 52%.
Storage tanks for 120,000 cu.m (the total volume amounts to 172,000 cu.m).
Finished Products Sector with 2 either-direction railway tank filling racks for 71 rail tankers.
Capacity of crude oil transportation through oil trunk pipelines of Transneft JSC – 1.7 MTPA.
Connected to the Shaim – Novosibirsk oil trunk pipeline with the capacity of up to 1.7 MTPA and Ust-Baluk – Kurgan – Ufa – Almetyevsk (UBKUA) with the capacity of up to 4.3 MTPA. Total capacity equals to 6.0 MTPA.
Simultaneously with construction and commissioning of the workflow stages Antipinsky oil refinery acquired and repaired railway station Antipino, in the proximity of which the Finished Products Sector (FPS) was built. It is intended for unloading of light refined oil products (gasoline, diesel) by rail.
The FPS is a detached facility connected with the main area of the refinery by means of industrial pipelines with the total length of about 3,0 km located not far from Antipino station. The area of the site is 15 ha. There are two either-direction tank filling racks making it possible to load 71 rail tankers at a time with a relay tank terminal of 20,000 cu.m.



































Comments